
Questions, process & shipping
The answers buyers ask for before the first call — ordering, lead time, terms, training and support.
How a deployment runs
01Inquiry
Send the floor plan, scenes and workload. You get an engineer's reply — not a brochure — within 24 hours.
02Scope & quote
We match machines to floors, size the fleet, and quote with lead time and trade terms in one document.
03Pilot order
Most sites start at 1-2 units. Pilots ship on the same quality gates as fleet orders — minimum order is 1 unit.
04Production & QA
Your units pass the 6 gates and 48-hour aging run; serial numbers and test logs are shared before shipping.
05Shipping
FOB Shenzhen by sea or air in reinforced wooden crates, with compliance documentation inside.
06Deployment & training
Remote mapping, commissioning and operator training; on-site sessions for larger fleets. Support runs from day one.
Frequently asked questions
What is the minimum order quantity (MOQ) for AOMAN robots?
How long is the production lead time?
What are the payment terms?
Which certifications do AOMAN robots have?
How do you control quality during production?
How long does on-site deployment take?
Can AOMAN robots integrate with our elevators, POS or access control?
How do I manage a fleet of robots?
Do you provide operator training?
What does the after-sales support include?
How long do the robots last and what about the battery?
What is the typical ROI timeline?
Can I customize the robot's appearance, software or payload?
What are the shipping terms and delivery options?
Shipping & logistics
Units ship FOB Shenzhen by sea or air in reinforced wooden crates — sea freight to major ports typically takes 25-35 days, air freight days not weeks. Battery packs travel under UN38.3 transport certification, and compliance documentation rides inside every crate. Confirm the schedule for your port with your quote.
